Evening time Noise Monitoring Results
Station M5, Chuk Lam Ming Tong(near entrance)
 
Date Start Time End Time  Weather Noise level (dB(A)) Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
26/02/2014-a 22:45 22:50 Fine 60 62 50 Works in tunnel Road traffic at San Wan Drive  According to contractor, general construction works was in process accordance to CNP. 20.2 <5 B&K 2238  S/N : 2684503 B&K 4231  S/N: 3004068
26/02/2014-b 22:50 22:55 Fine 52 53 51 20.2 <5 B&K 2238  S/N : 2684503 B&K 4231  S/N: 3004068
26/02/2014-c 22:55 23:00 Fine 62 64 49 20.2 <5 B&K 2238  S/N : 2684503 B&K 4231  S/N: 3004068
26-Feb-14 22:45 23:00 Fine 60 61 50 Works in tunnel Road traffic at San Wan Drive  20.2 <5 B&K 2238  S/N : 2684503 B&K 4231  S/N: 3004068
      Max 62        
Min 52